A 100 kWp photovoltaic system was installed as an economically viable self-sufficient power solution for a senior citizens' residential complex.
Our COMPACTFLAT SN 2 system was used in combination with our SN2 Q PLUS feet and a special pre-construction solution: first the substructure was prepared, then the gravel was blown in and used directly for ballasting - all that remained to be done was to install the modules.
The result is an efficient, fast and scalable PV solution that can be optimally integrated into the construction process.